Upon investigation, it was found that the Andijan Aluminum Products Remanufacturing Plant illegally used natural gas worth 6.8 billion soums. notify Department of Energy.

During the control activities carried out by “Uzenergoinspeksiya”, it became known that citizen YA established an aluminum processing workshop on the territory of BSZ LLC.

According to preliminary calculations, since it can be directly connected to the gas pipeline network without the need for a certificate, Damage to state interests: 6 billion 782 million soums.

This violation has been released. The relevant documents have been sent to law enforcement agencies.