
[ad_1]
Tazabek – President of the Kyrgyz Republic Sadyr Japarov Today, August 30, I learned about the development plans for the Chui region and the city of Cala Barta. This was reported by the Press Office of the Presidential Palace.
Sadyr Japarov was informed about the plans and results of work for the development of the city of Kara Barta within the allocated 1 billion som.
As a result of targeted transfers, a 10-km highway in the city of Cala Barta was overhauled (installation of continuous asphalt concrete pavement) for a total of 184.7 million soms, and the road to Cala Barta was repaired. The opening of industrial enterprises was also carried out from the local budget.
The project includes the construction of an asphalt concrete plant and a stone crushing workshop, a concrete plant, a brick making machine, a road sign production workshop, and the purchase of special equipment for road construction.
The project aims to develop tourism, provide quality services to the population, increase budget revenues and create new jobs. The project is responsible for installing 78 trade pavilions and landscaping the territory.
“The Danish company, which had been idle for more than 30 years, will also resume pasta production. Today, the reconstruction of the building is still continuing. The project will be completed by the end of 2024. The factory area exceeds 4,000 square meters,” the press office reported.
In addition, people learned about the reconstruction and construction of social and sports facilities, water and sewage systems, and the installation of cameras.
Follow the latest activities on the Telegram channel @tazabek_official
This material is the intellectual property and copyright of Tazabek.kg.
Material may not be reproduced without the consent of the editor and a formal agreement.
[ad_2]
Source link