Broadcast United

Guarinbas transportation starts operating after the festival

Broadcast United News Desk
Guarinbas transportation starts operating after the festival

[ad_1]

Despite the violence in recent days, the capital is starting to return to normalcy as transportation options for citizens are approved.

Through their accounts on social networks

However, according to the entity, the Plaza Venezuela and College of Engineers stations began operating at 10:05 am.

The Los Teques metro system also provides service at all stations, with two trains running and a wait time of 28 minutes.

Likewise, workers Metro bus system The following routes: Las Mercedes-Chacaíto; Florida-Sabana Grande; Plaza de Las Palmas, Venezuela; the hills of Plaza Bello Monte, Venezuela and Plaza Simon Rodríguez Sarria, Venezuela.

Truck driver on the street

Gradually, drivers of ground transport units began to circulate on different routes in Caracas and provide full-day service.

From the beginning, drivers have been activated on the following routes: Cemetery – Carmelitas; Venezuela – Plaza Carrico; Cá – El Valle – La Bandera – Chacaito; Plaza La Rinconada, Venezuela; Carmelitas – Petare and El Silencio – Petare, as confirmed by the ULTImas Noticias team during a tour of the city.

Caracas Metro reopens all stations

Working through Miranda

The Transmiranda service has also been launched on a route in the city of Guarenas to transport users to their homes, work or places of study.
The system has different urban and suburban routes to transport users in the cities of Altos Mirandinos, Barlovento, Guarenas, Guatire and Sucre, at a cost of 10 bolivars.

In the Tui Valley

The business sector, public transport and rail systems in Valles del Tuy have resumed normal operations this Wednesday following the violence that occurred in the last 48 hours.

The rail system reported fully normal commercial service from Simón Bolívar station in La Rinconada, Caracas, to Ezequiel Zamora station in Cua.

The average waiting time for users on the platform is 20 minutes, and the traffic is moderate. “All stations have been put into operation,” said a person from the National Railway Administration.

The Mayor of Cristóbal Rojas, Humberto Marte Tejada, confirmed the normalization of public transport services in all areas of the town, urban, suburban, trunk and taxi routes; at the same time, he insisted that the aim is to guarantee the mobility and free movement of citizens.

“We are working to restore normalcy in the city of Charalave and the entire Valles del Tuy region, as this area is a peaceful territory, so our deployment is to guarantee security, private and public property and the services of our communities,” the local leader stressed.

The Tuero Railway is fully operational

According to information provided by Mrs. Gomez and Elami Carreño

[ad_2]

Source link

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *