[ad_1]
Minister of Housing, Utilities and Urban Communities Engineer Sherif El-Sherbiny confirmed that over the past 10 years, 13 drinking water projects (construction-expansion of stations) with a capacity of 792,500 cubic meters per day were implemented, and 78 sanitation projects were implemented in the Sharkia governorate, including the total cost of water and sanitation projects in the first phase of the Presidential Initiative for the Development of a Decent Life in Rural Egypt, exceeding 7 billion pounds.
Implemented 3 sanitation projects
He pointed out Minister of HousingSharkia governorate is completing and implementing 6 drinking water projects aimed at improving services and increasing pressure, including “Tarot – Al-Qurain – Kafr Al-Hamam – Kafr Al-Jaraya – Al-Manstarli – Al-Rahmaniyah”, and 3 urban sanitation projects are being implemented, namely the Zagazig sewage rehabilitation project, the Abu Omar facility sewage project and the Belbeis city sewage network expansion project.
Providing health services to villages
Major General Ihab Khader, director of the National Drinking Water and Sanitation Authority, explained that there are 160 rural areas in the Shaqiya governorate with sewage services, accounting for 31.4% of the population. Rural areasThe resident population exceeds 2 million, accounting for 34.7% of the rural population, and health services cover 165 rural areas, accounting for 32.4% of the rural areas; the resident population is 1 million and 673,000, accounting for 28.9% of the rural population.
(function(d, s, id) {
var js, fjs = d.getElementsByTagName(s)(0);
if (d.getElementById(id)) {
return;
}
js = d.createElement(s);
js.id = id;
js.src = "https://connect.facebook.net/ar_AR/sdk.js";
fjs.parentNode.insertBefore(js, fjs);
}(document, 'script', 'facebook-jssdk'));
[ad_2]
Source link