Broadcast United

Correction | Kaleva

Broadcast United News Desk
Correction | Kaleva

[ad_1]

Kaleva 27.8. pp. 2–3 and Online In published reports about the so-called Oulu Energy Zone in Myllytull, it was falsely stated that the construction of the Sivaka residential building in Oulu would start in 2015-2016, or at the latest in 2017. The construction of the residential building would start in 2025-2026, or at the latest in 2027.

[ad_2]

Source link

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *