Broadcast United

New features in Ourika Tunnel

Broadcast United News Desk
New features in Ourika Tunnel

[ad_1]

The study, which will last four months, will scrutinize every aspect of the project. From the layout of the roads to the sanitation system, including the design of intersections, nothing will be left to chance. The goal: to guarantee the safety and fluidity of traffic while respecting the environment.

read: Morocco: Tourists nearly die on their way to Ourika

The project will be carried out in two phases. The first preliminary phase will allow the general outlines to be determined and the most promising options to be selected. A more detailed study will then be carried out with precise technical specifications, said Media24.

If the research proves conclusive, work could begin quickly, opening up new prospects for the region.

[ad_2]

Source link

Share This Article
Leave a comment

Leave a Reply

Your email address will not be published. Required fields are marked *